• Gallery Home
  • Goleta Depot
  • Events
  • Projects
  • Model Trains
  • Rail Trips
  • People
  • Educational Programs
  • Go To Museum Site
  1. Goleta Depot Book
  2. Chapter 9 Back To Basic

Chapter 9 Coombs Slides

Read More
South end of Goleta Depot exterior, 1/1985. acc2005.001.0459
17 / 444

South end of Goleta Depot exterior, 1/1985. acc2005.001.0459

From Museum Slides

  • Excavation for train-order board footing, 7/1983 or 8/1983. acc2005.001.0383
  • Gene Allen prepares train-order pole for re-installation, 10/1983. acc2005.001.0420
  • Gene Allen prepares train-order pole for re-installation, 10/1983. acc2005.001.0421
  • Specialty Crane & Rigging truck raises train-order pole for re-installation, 10/1983. acc2005.001.0422
  • Specialty Crane & Rigging truck raises train-order pole for re-installation (Bill Everett and Gene Allen are at left-center), 10/1983. acc2005.001.0423
  • Specialty Crane & Rigging truck raises train-order pole for re-installation (Bill Everett and Gene Allen are at right), 10/1983. acc2005.001.0424
  • Specialty Crane & Rigging truck raises train-order pole for re-installation (Bill Everett, left, and Gene Allen are watching), 10/1983. acc2005.001.0425
  • Specialty Crane & Rigging truck raises train-order pole for re-installation (Bill Everett, left, and Gene Allen are watching), 10/1983. acc2005.001.0426
  • Specialty Crane & Rigging truck raises train-order pole for re-installation (Gene Allen is watching), 10/1983. acc2005.001.0427
  • Gene Allen and Bill Everett align train-order pole as it is lowered by Specialty Crane & Rigging crew, 10/1983. acc2005.001.0428
  • Gene Allen bolts the train-order pole down to its foundation, 10/1983. acc2005.001.0429
  • Bill Everett watches as train-order pole is attached to its foundation, 10/1983. acc2005.001.0430
  • Gene Allen supervises as Specialty Crane & Rigging crew disconnect crane from train-order pole, ca. 11/1/1983. acc2005.001.0431
  • Gene Allen attaches bell-cranks to newly re-installed train-order pole, ca. 11/1/1983. acc2005.001.0432
  • Banner Construction crew grades in preparation for standard-gauge track construction in front of Goleta Depot, 1/1985. acc2005.001.0456
  • South end of Goleta Depot exterior, 1/1985. acc2005.001.0457
  • South end of Goleta Depot exterior, 1/1985. acc2005.001.0459
  • Goleta Depot exterior during track grading, 1/1985. acc2005.001.0460
  • Banner Construction crew grades in preparation for standard-gauge track construction in front of Goleta Depot, 1/1985. acc2005.001.0461
  • Goleta Depot exterior, 1/1985. acc2005.001.0462
  • No Comments
  • Photo Sharing
  • About SmugMug
  • Browse Photos
  • Prints & Gifts
  • Terms
  • Privacy
  • Contact
  • Owner Log In
© 2023 SmugMug, Inc.